Residence Hall Bathroom Renovation

east eggleston residence hall was a time critical renovation for virginia tech, requiring only 2.5 months from the design through the end of construction and final project completion.  the scope consisted of the reconversion of and change of occupancy of 15,000 square feet of office space back to student residence spaces.  all bathrooms, student rooms, corridors, and lounges received new finishes and fixtures.  damaged, worn, and incorrect finishes were removed, the substrates inspected and modified as required to comply with current codes. constant communication and meetings occurred with all the disciplines for successful, on-time project completion.